Complex FPSO top chain replacement completed safely and efficiently
InterMoor, a brand in Acteon’s Moorings and Anchors business line, was contracted by a major North Sea operator to provide project management
InterMoor’s split lowering system (SLS) shallow water capping stack installation method
A capping stack is a device that is placed on top of a well to stop or redirect the flow of oil and gas in the event of an emergency (blowout).
Improved soil management for offshore wind – Part 1
Addressing the challenges posed by soil conditions in offshore renewable energy projects is a crucial task for developers. The unexplored locations of these projects require new geotechnical frameworks